echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Active Ingredient News > Drugs Articles > About the role of the thermal shock test chamber

    About the role of the thermal shock test chamber

    • Last Update: 2022-10-13
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    Test chamber function: not the same temperature section impact: by the multi-level air conditioning evaporator structure is relatively disconnected, the total area of manipulation and air conditioning refrigeration capacity air conditioning expansion valve pairing, the application of refrigeration unit output effectively reduce the electric heater in the heart output, more than stable environmental protection and energy saving; There is also a separate ventilation valve that posesically introduces environmental quality
    when the exhaust pipe (repaired at room temperature).
    The air inlet inhales the gas
    outside when the operating temperature is exposed.
    The heat flow discharged from the outlet from the mechanical chamber and the pilot area performs the reservation function at regular intervals
    .
    Set up the experiment in advance at the beginning of the experiment, the environmental test chamber is fully automatic to start and prepare in advance to start the experiment
    .
    Nudity Time Reduction Effect: The role of the lower temperature of the pilot area is transformed to the next nudity after the low temperature exceeds the nude temperature
    .
    Pre-solution/post-treatment process function: Before or after the start or completion of the circulatory system experiment, the specimen is exposed to a high-temperature natural environment (quenching and tempering) for a necessary period of time
    .
    Dry and manic running effect: the time necessary for the experimental assembly to run under the unit
    .
    The cold and thermal shock test chamber is divided into three-compartment and two-compartment according to the experimental requirements and testing standards, and the difference depends on the experimental method and structure
    .
    The three-compartment is divided into a cold storage room, a heat storage room and a laboratory, and the goods are placed in the laboratory
    when testing.
    The two-compartment is divided into a high-temperature chamber greenhouse and a low-temperature greenhouse, which is based on the motor to promote the basket fitness exercise to maintain the conversion of the high and low temperature test, and the goods are placed in the basket and are moved together with the
    basket.
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.