-
The installation of the steel structure of Shenghong Refining & Chemical Ethylene Plant starts
Time of Update: 2021-12-14
According to reports, Shenghong Refining & Chemical Ethylene Plant has a total of 29 frame structures, 1 main gallery, 16 branch gallery, and a total steel structure of 30,000 tons.
-
Three sets of equipment of Nanjing Project won the Excellent Welding Engineering Award
Time of Update: 2021-12-14
7 million tons of Zhongan United /Year Two projects including the tank farm project of the methanol and conversion olefin project and the crude oil tank farm project of the China Science and Technology Refining and Chemical Integration Project won the first prize of the Excellent Welding Project Activity of the China Engineering Construction Welding Association, and Sinopec Xinjiang Coal-to-Gas Natural Gas Pipeline The fourth section of the Qianjiang-Shaoguan Gas Pipeline Project won the Excellence Award.
-
The U.S. shale industry may not be able to return to the level before the outbreak
Time of Update: 2021-12-14
You must know that before oil prices and demand plummeted with the spread of the new crown pneumonia epidemic, US crude oil production just reached 13 million barrels per day .
-
The hoisting of the oil removal protection bed of Silbang Petrochemical Project is completed
Time of Update: 2021-12-14
From the arrival of the degreasing protection bed equipment to the meticulous deployment of the project, the hoisting is actively organized, from the hook hoisting on the car to the equipment foundation, each equipment only takes 30 minutes to complete the hoisting operation, which saves time and increases the efficiency of the crane.
-
Shengli Oilfield Shitiaolong Project kicks off the prelude to mine application
Time of Update: 2021-12-13
The deep plugging and regulation technology in the high water cut period provides technical support for improving the development effect of ultra-high water cut old oilfields.
-
Successful application of high-yield sulfur recovery technology in Nanjing Project
Time of Update: 2021-12-13
In addition to the Guangzhou Petrochemical sulfur recovery project, the latest GD10 technology has been successfully applied to multiple sets of Sinopec sulfur recovery devices, all meeting the emission standards.
-
Serbon Petrochemical Project takes many measures to promote winter construction
Time of Update: 2021-12-13
On the basis of optimizing the winter construction organization design and construction technology, the project department strengthens daily supervision and inspection, and tracks key parts and process-related technical personnel throughout the whole process of “by-site” tracking, and timely rectifies the problems found in the construction; In the concrete pouring construction of corridor foundation, water treatment, etc.
-
Chuanwei VAE project pipeline installation set off a construction climax
Time of Update: 2021-12-13
Before the construction of the third engineering company of the fourth construction pipeline, the project department actively took countermeasures, carried out careful deployment and detailed planning of the pipeline prefabrication work, comprehensively optimized and improved the installation construction organization plan, and integrated the project manpower, machine tool resources, design drawings, and materials.
-
The Fourth Construction Zhongke Refining and Chemical Project Department commends advanced units and individuals
Time of Update: 2021-12-12
At the summary and commendation meeting, the China Branch Refining and Chemical Integration Project Department of the Fourth Construction Company put forward the overall construction goals for 2021, and required all construction units and all participating employees to continue to maintain the honor and disgrace with the Fourth Construction Company and the project department.
-
High temperature and high pressure downhole tool testing center obtained CNAS certificate
Time of Update: 2021-12-12
After completion, the testing center will complete 130 samples of high-temperature and high-pressure downhole tool testing in accordance with the requirements of the quality management system and testing standards, and provide relevant experimental support and verification for the declared packer and bridge plug testing standards, and the testing capabilities have been obtained.
-
ANZ Bank: Brent crude oil expected to hit US$60/barrel in the second half of 2021
Time of Update: 2021-12-12
ANZ Bank predicts that in the second half of 2021, global crude oil demand will increase by 4 to 5 million barrels per day .
ANZ Bank said that it currently forecasts that Brent crude oil will hit $60 a barrel in the second half of 2021 .
-
Normalization of epidemic prevention and control in the project department of Serbon Petrochemical Engineering
Time of Update: 2021-12-12
In addition, the project department actively publicizes and implements the various epidemic prevention documents issued by the company and the owner.
In the next step, the project department will continue to pay close attention to the dynamics of the epidemic, earnestly implement various work deployments and requirements, and scientifically prevent and implement precise policies.
-
Compressor oil transportation of Gulei Refining and Chemical Ethylene Plant
Time of Update: 2021-12-12
Sinopec News Network News After careful preparation by the participating employees, the Gulei Refining and Chemical Integration Project 800,000 tons/year ethylene project K-302 low pressure methane and K-201 cracked gas two large-scale compressors undertaken by the Tenth Construction Company of Refining and Chemical Engineering The oil transportation work started on the 8th and 9th, respectively.
-
The directional drill crossing Wanglei Avenue of the Changchen Pipeline was successfully towed
Time of Update: 2021-12-11
Special personnel from the project department were on duty along the route to ensure that the directional drill was successfully towed once.
-
Zhejiang Petrochemical residual oil hydrogenation heating furnace enters the end of construction
Time of Update: 2021-12-11
In the face of the tight construction period, the project department will decompose layer by layer according to the node target, and implement it in each team and each position, and strive to complete the welding of all the process pipes of the three heating furnaces by February 8.
-
Real-time monitoring of pipeline corrosion by electronic eye in Northwest Oilfield
Time of Update: 2021-12-11
On January 6, the pipeline corrosion online monitoring device developed by the Northwest Oilfield Petroleum Engineering Technology Research Institute successfully passed the acceptance at the oilfield No.
In March 2019, Northwest Oilfield Petroleum Engineering Technology Research Institute began a special study on pipeline corrosion online monitoring technology.
-
Shijian Company’s Pipeline Welding Sets a New Record
Time of Update: 2021-12-11
In the Gulei Refining and Chemical Engineering Project Department, the pipeline prefabrication plant has upgraded the tooling to expand the applicable pipe diameter range of the submerged arc welding machine.
-
Sino-Korea Petrochemical's ethylene de-bottleneck renovation gas boiler successfully ignite
Time of Update: 2021-12-11
Sinopec News Network reported on the afternoon of January 12 that the Sino-Korea Petrochemical Ethylene Debottleneck Renovation Project undertaken by the Fifth Construction Company of the Refining and Chemical Engineering Group Co.
-
Smart map is first applied in Jianghan Oilfield Power Grid
Time of Update: 2021-12-09
The application of this platform can realize transmission line navigation, mobile phone terminal can voice navigation, computer terminal can make patrol route map, and after unified registration, operation and maintenance staff can share location in real time and realize on-the-job management; it can also present the three-dimensional terrain of the tower.
-
The first QC achievement of Shengli Technical Inspection Center won provincial commendation
Time of Update: 2021-12-09
The outstanding achievements of this award are researched and developed by the Special Equipment Inspection Institute of Shengli Oilfield Technical Inspection Center.