-
Shengli Dongxin Operation Area: Innovative technology makes inefficient wells come to life
Time of Update: 2021-09-17
Factors such as thickness, porosity, permeability and shale content have determined the amount of sand inhibitor to be 40 cubic meters with a concentration of 12%; third, to ensure that the sand inhibitor enters the formation uniformly, the construction displacement is controlled at 0.
-
Shengli electromagnetic flaw detection technology enters offshore oil field for the first time
Time of Update: 2021-09-17
Recently, the array electromagnetic flaw detection technology developed by the Shallow Sea Research Institute of Shengli Oilfield Petroleum Engineering Technology Research Institute completed the casing damage detection task in the offshore well CB351-2 for the first time, providing detailed data support for subsequent repairing operations.
-
Hundreds of academicians and experts join forces: the industrial foundation starts to solve the "stuck neck" problem
Time of Update: 2021-09-17
Academician Li Xiaohong, Secretary of the Party Leadership Group and Dean of the Chinese Academy of Engineering, said that the international environment is becoming more and more complex, especially the blockade, decoupling, and "stuck neck" of some countries on my country's technology and industry, which highlights the necessity and urgency of accelerating the improvement of industrial basic capabilities.
-
[News story] Twists and turns to check for leaks
Time of Update: 2021-09-17
Two days ago, Guo Shuli, the deputy director of the oil workshop of Tianjin Petrochemical, reported that there were rare materials and the smell of oil and gas on the south bank of the Bameter River on the south side of Gangtang Highway in Binhai New Area, and he immediately rushed to the scene.
-
Shengli Oilfield strengthens cooperation with Baker Hughes
Time of Update: 2021-09-17
At the test site, Shengli Oilfield and Baker Hughes technicians had an in-depth exchange of carbon dioxide utilization and storage technology, and explored more flexible ways of cooperation to promote more efficient cooperation between the two parties.
-
Shengli Petroleum Engineering Company starts the battle to enter the fracturing market in Xinjiang
Time of Update: 2021-09-17
Equipped with a set of 2500 fracturing unit, based on the service to guarantee the Xinchun Oil Production Plant and Xinjiang Exploration Company, and at the same time radiate the surrounding markets such as Qinghai, actively undertake acidizing fracturing, flushing and sand control, large displacement well washing and other workloads, and strive to achieve market revenue New breakthroughs, grasp the initiative of the Xinjiang fracturing market.
-
Southwest oil and gas production increased by 26.3% year-on-year in the first quarter
Time of Update: 2021-09-17
In the first quarter, Southwest Oil & Gas Branch kept a close eye on its annual targets and tasks, continued to accelerate the pace of production and operation, and vigorously promoted breakthroughs in exploration and large-scale production and production.
-
Fuling shale gas field production and sales growth in the first quarter
Time of Update: 2021-09-17
cn News from Jianghan Oilfield Fuling Shale Gas Field accelerates the pace of production and construction, optimizes drainage and production technology, strengthens safety and environmental protection, and makes every effort to ensure the efficient advancement of natural gas reserves and production.
-
Changling Refinery successfully solved the problem of core pulling of heavy oil heat exchanger
Time of Update: 2021-09-17
Recently, they completed the core-pulling overhaul of more than 10 heavy oil heat exchangers in the coking unit, and achieved a major breakthrough in a single research.
During this overhaul, the core-pulling cleaning of 14 heavy oil heat exchangers in the coking unit became an important focus of the overhaul.
-
Jingmen Petrochemical's gasoline production enters a new stage of automatic blending
Time of Update: 2021-09-17
Sinopec News Network reported at 10 am on March 30th, Luo Yi, the chief operator of the DCS room of the second district of Jingmen Petrochemical's storage and transportation department, according to the scheduling instructions, entered the three component oils in proportion to the 106 tank reconciliation task bar, and then opened the software Switch, after the gasoline blending system interface display initialization is completed, click the start button with the mouse.
-
Northwest Oilfield: "Sky Magpie Bridge" helps Shunbei take off
Time of Update: 2021-09-17
In the final sprint stage, in order to ensure that the project was successfully put into operation at one time, even though there are supervisors and quality leaders to check every link every day, Tang Sheng, deputy manager of the project department, dare not relax his vigilance.
-
Zhongyuan Petroleum Engineering: awakening the sleeping "black gold" underground
Time of Update: 2021-09-17
Although volume fracturing technology has been the core technology for effective production of tight reservoirs at home and abroad, Dongpu tight oil reservoirs have the characteristics of deep burial, small single layer thickness, complex lithology, and poor connectivity.
-
Chongqing Drilling: Obtained two national patents
Time of Update: 2021-09-17
It is reported that the patent of "an anti-flammability and explosion-proof diversion device for air drilling" declared by the company can quickly and effectively adsorb the natural gas in the wellbore during casing operation and discharge it into the combustion pool for combustion, so that the pure natural gas in the wellbore is not The rotating blowout preventer will overflow to the drill floor to ensure the safety of casing running operations.
-
Beihai Refining and Chemical Restructuring Project High Standard China Communications
Time of Update: 2021-09-17
Sinopec News Network reported on April 1, the Beihai Refining and Chemical Restructuring Project undertaken by the Fifth Construction Company of the Refining and Chemical Engineering Group to achieve a high standard of delivery.
-
Anqing Petrochemical Thermal Power Department strengthens ash pipeline inspection to ensure safe and environmentally friendly production
Time of Update: 2021-09-17
China Petrochemical News Network News Since this year, the Anqing Petrochemical Department of Thermal Power has formulated measures to strengthen the inspection of the ash pipeline from the operation department to the Chenjiachong ash yard to ensure the safe operation of the ash pipeline without running, dripping, and causing environmental impact.
-
Completed fracturing of key well JPH-489 in North China Well
Time of Update: 2021-09-17
" The production and operation department surveyed the site in advance and formulated a detailed "operation chart" for speeding up and efficiency of well JPH-489 fracturing operation, so as to ensure that the time, schedule, cooperating unit, and responsible person were "four clear" to ensure that the construction proceeded according to the established rhythm.
-
Well Langye 1 well drilled and achieved good results
Time of Update: 2021-09-17
Sinopec News Network reported on March 28, with a whistle, the shale oil and gas risk pre-exploration well Langye 1 drilled by the 40659 well team of Chongqing Drilling Branch of Southwest Petroleum Engineering Company was drilled to a depth of 3226 meters, which was safe and smooth.
-
Jianghan Logging Sets Two Construction Records in Shunbei 41X Well
Time of Update: 2021-09-17
Recently, Jianghan Logging Company successfully completed the completion and logging of Shunbei 41X well, setting two records with the deepest depth of 8645m and the highest well temperature of 172℃ in the Northwest Work Area.
-
Southwest Diamond One Receives Congratulatory Letter from Party A
Time of Update: 2021-09-17
With 13 records in the new field block, the Southwest Oil and Gas Branch Capacity Construction and Exploration Project Department sent a congratulatory letter to congratulate them.
-
Gulei refining EVA plant is busy during Qingming holiday
Time of Update: 2021-09-17
It is understood that the current construction difficulty is the air supply pipeline operation of the degassing silo in the EVA unit 800 area.
The construction of the low- and medium-pressure pipelines of the unit has completed 96,000 inches and 35 pressure test packages .