-
Well HH92P1 creates multiple drilling records for horizontal wells of North China Oil & Gas Branch
Time of Update: 2021-10-05
Sinopec News Network reported on March 20, the second-level wellbore structure and three-dimensional horizontal well HH92P1 well of North China Oil and Gas Branch of Honghe Oilfield was successfully completed.
65% compared with the adjacent well, and the drilling cycle was shortened by 34.
-
Anqing Petrochemical actively promotes the maintenance of storage tanks
Time of Update: 2021-10-05
Sinopec News Network News Since the full resumption of work in mid-March, Anqing Petrochemical’s storage and transportation department has overcome the adverse effects of rainy weather, made overall plans and carefully arranged, raced against time to promote storage tank maintenance, to ensure the smooth implementation of the annual tank maintenance plan for safe production Lay a solid foundation.
-
Jianghan Oilfield completed the first multi-pulse high-energy gas fracturing construction
Time of Update: 2021-10-05
China Petrochemical News Network reported on March 20, in Well Ling 29 Incline-1, Jianghan Oilfield used the "multi-pulse high-energy gas" fracturing process for the first time to systematically evaluate the stimulation capability and productivity of Jianghan mid-low permeability fine sandstone reservoirs.
-
Qilu Petrochemical Olefin Plant completed the overhaul of the cracked gas compressor GB-1201 rewaterer ahead of schedule
Time of Update: 2021-10-05
The olefin plant immediately reported to the relevant department of the company, requesting that the compressor should be stopped in a short time corresponding to the weather emergency, and the leakage rehydrator should be short-stopped and repaired to completely solve this problem.
-
Qilu Petrochemical's chlor-alkali plant resolutely wins the battle for benefit
Time of Update: 2021-10-05
The operation and maintenance center and maintenance units have strengthened equipment maintenance, and communicated with the chlor-alkali plant in a timely manner when problems are found to maintain high-load production.
-
Sino-Korea Petrochemical's daily ethylene output hits a new high
Time of Update: 2021-10-05
It has helped increase production capacity by adjusting the ratio of raw materials, commissioning new ethylene debottlenecking renovation projects, and optimizing the operation of ethylene rectification towers.
-
Yangzi Petrochemical Quality Inspection Center: Small blackboard conveys big information
Time of Update: 2021-10-05
Sinopec News Network News. On the wall of the aromatics laboratory of the Yangzi Petrochemical Quality Inspection Center, there is such a blackboard. Early in the morning every morning, the worksho
-
The first production facility in Zhenhai Base was completed and put into use
Time of Update: 2021-10-05
Since the start of construction in April 2020, the project management team has overcome the impact of many unfavorable factors such as the new crown pneumonia epidemic and typhoon, and completed various construction task node goals with quality and quantity.
-
Shared service Dongfen launches benchmarking world-class management improvement actions
Time of Update: 2021-10-05
In order to ensure high-standard planning and high-quality implementation of benchmarking world-class management improvement activities, the company timely issued the "Notice on Carrying out the "World-class Management Improvement Action for Benchmarking"", established a benchmarking improvement action leading group, and clarified the guiding ideology In accordance with the improvement goals, it has arranged the work of 3 stages and 9 links of benchmarking improvement, and established 4 mechanisms including organization and operation, supervision and implementation, evaluation and incentives, and work guarantee.
-
Shengli Zhuangxi Operation Area: To create benefits from low-yield and low-efficiency wells
Time of Update: 2021-10-05
After the implementation of combined fracture network fracturing measures in Well Zhuanggeng 73, a maximum daily oil increase of 10.
Well Zhuangeng 73 has been in low-yield and low-efficiency production since 2013, with a daily fluid output of less than 2 tons and a daily oil output of only about 0.
-
Shanghai Petrochemical New Law Exhaust Gas
Time of Update: 2021-10-05
4 aromatics unit of the Shanghai Petrochemical Aromatics Department, a portable waste gas treatment device was used for the first time to recover and treat VOCs (volatile organic compounds) that may escape into the air during the steaming process.
-
Guangzhou (Luoyang) project started Zhenhai project hundred days to tackle tough problems
Time of Update: 2021-10-05
The competition plan clarified the labor competition node: complete the "689" target on March 31; (60% of the prefabricated installation of process pipelines, 80% of the equipment installation, and 90% of the steel structure installation); Electricity; 97.
-
Shengli Dongxin Operation Area: Optimized construction helps high water-cut wells improve quality and efficiency
Time of Update: 2021-10-05
Compared with the previous measures, the daily oil level has increased by 1.
5 tons per day, and the water content has decreased by 4.
The daily oil level was 0.
6 tons/day, the water cut increased from 95.
-
The chemical sales synthetic resin export team wins large orders from Egyptian customers
Time of Update: 2021-10-05
Respond quickly to seize opportunities-on-site service lays the foundation for cooperation Back in the last week before the Spring Festival in 2020, the North China Resin Department received an inquiry for an export order of 1,500 tons from the account manager of Tianjin Co.
-
The propylene and propane separation tower of Jiangsu Silbang Petrochemical Company is hoisted in place
Time of Update: 2021-10-05
So far, the hoisting of three large-scale equipment of de-propanizer, de-ethane gas stripper, and propylene-propane separation tower has been successfully completed.
-
Guangzhou Petrochemical: Never let any parameter change abnormally
Time of Update: 2021-10-05
Because there is no abnormality in other operating parameters, based on years of operating experience, Liao Yujun preliminarily judged that the abnormal rise in tower pressure was not caused by ambient temperature, and the tower pressure measuring instrument was more likely to fail.
-
No. 1 Oil Production Plant in North China: Ensuring production without fear of "cold spring"
Time of Update: 2021-10-05
China Petroleum & Chemical News reported that “the cotton work clothes that were just taken off are going to be put on again. ” Recently, the six areas of the oil production management area of
-
Jinling Petrochemical: A new generation of office system goes online
Time of Update: 2021-10-05
The new system integrates document management and meeting management, further improves the company's internal business collaboration and office efficiency, and strongly supports management innovation.
Because the company's original OA system has been running for many years, some functions can no longer meet office needs.
-
Anqing Petrochemical Department of Thermal Power actively builds a "safety net" for lightning protection
Time of Update: 2021-10-05
Sinopec News Network News Anqing Petrochemical’s Thermal Power Department takes "equipment management improvement" as the starting point to comprehensively carry out a large-scale investigation of equipment lightning protection hazards, actively builds a lightning protection "safety net", and focuses on inspections and tests of grounding devices for equipment in the operations department.
-
The first successful application of layered combined fracturing technology in Henan Oilfield
Time of Update: 2021-10-05
It is necessary to improve the conventional tools to realize the separation of the mechanical three-layer pipe string and the temporary plugging of the pitching ball.