echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Petrochemical News > Yangzi Petrochemical’s CEB plant completed its first preventive maintenance

    Yangzi Petrochemical’s CEB plant completed its first preventive maintenance

    • Last Update: 2021-07-28
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Sinopec News Network reported on July 20, the first preventive overhaul and maintenance of the CEB device 1200B in the liquid wharf operation area of ​​the Yangzi Petrochemical Storage and Transportation Plant, and the first start-up was successful
    .

    The CEB ultra-low combustion emission device is currently a relatively advanced environmental protection device for oil and gas exhaust gas treatment.
    It has the advantages of small footprint, high safety performance, good treatment effect, and short start-up time.
    It has strong adaptability to the concentration of combustibles and a high oil and gas combustion rate.
    99.
    99%, can achieve ultra-low emissions without smoke and dust
    .


    In June last year, Yangzi Petrochemical successively completed and put into operation three sets of such devices, and introduced 40 light oil storage tanks into the CEB system, effectively controlling the exhaust emissions of the storage tanks


    Recently, the technicians of Yangtze Wharf found a large number of flocs in the filter screen of the unit during the operation monitoring of the CEB device.
    In order to ensure the stable operation of the device in high temperature weather, it was submitted to the safety and environmental protection department and the dispatching department of the company on July 19 Application, planned to stop for 4 hours, replace the filter screen, and maintain the pressure reducing valve and key parts of the unit, which was approved
    .

    At 8 o'clock in the morning on July 20, the CEB device was shut down as planned.
    Under the guidance of the manufacturer’s technicians, the operation area successfully completed the overhaul and maintenance procedures, and it drove successfully once at 11 o'clock in the morning, which was more than planned.
    The time is advanced by 1 hour
    .


    This is the first preventive maintenance of the company's three sets of CEB devices since the operation, and accumulated experience for the maintenance of similar devices


    (Li Wei)

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.