-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News Network reported on July 20, the first preventive overhaul and maintenance of the CEB device 1200B in the liquid wharf operation area of the Yangzi Petrochemical Storage and Transportation Plant, and the first start-up was successful
.
The CEB ultra-low combustion emission device is currently a relatively advanced environmental protection device for oil and gas exhaust gas treatment.
It has the advantages of small footprint, high safety performance, good treatment effect, and short start-up time.
It has strong adaptability to the concentration of combustibles and a high oil and gas combustion rate.
99.
99%, can achieve ultra-low emissions without smoke and dust
.
In June last year, Yangzi Petrochemical successively completed and put into operation three sets of such devices, and introduced 40 light oil storage tanks into the CEB system, effectively controlling the exhaust emissions of the storage tanks
Recently, the technicians of Yangtze Wharf found a large number of flocs in the filter screen of the unit during the operation monitoring of the CEB device.
In order to ensure the stable operation of the device in high temperature weather, it was submitted to the safety and environmental protection department and the dispatching department of the company on July 19 Application, planned to stop for 4 hours, replace the filter screen, and maintain the pressure reducing valve and key parts of the unit, which was approved
.
At 8 o'clock in the morning on July 20, the CEB device was shut down as planned.
Under the guidance of the manufacturer’s technicians, the operation area successfully completed the overhaul and maintenance procedures, and it drove successfully once at 11 o'clock in the morning, which was more than planned.
The time is advanced by 1 hour
.
This is the first preventive maintenance of the company's three sets of CEB devices since the operation, and accumulated experience for the maintenance of similar devices
(Li Wei)