echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Petrochemical News > Well J30-4-P9 in North China Oil & Gas Jin 30 Well Area Tested High Yield

    Well J30-4-P9 in North China Oil & Gas Jin 30 Well Area Tested High Yield

    • Last Update: 2021-09-30
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Recently, North China Oil and Gas Branch Company's Dongsheng Gas Field Jin 30 well block He 1 section productivity construction well J30-4-P9 tested a high-yield gas flow of 182,800 cubic meters per day, setting a record for Dongsheng Gas Field Jin 30.
    The horizontal wells in the well area have unimpeded new highs, further confirming the good development potential of the He 1 Member in this area
    .

    Aiming at the lithologic gas reservoir of the He 1 Member with strong gas heterogeneity in the Jin 30 well block of Dongsheng Gas Field, the scientific and technological personnel of the Institute deepened the sedimentary understanding, strengthened the integrated research of geology and geophysical prospecting, and summarized 8 kinds of sand body spatial superimposition.
    Types, and clarify the seismic response modes of different sand body superimposed types
    .


    On the basis of fine seismic calibration and interpretation, using isochronous stratigraphic slicing technology based on spatial relative resolution, the distribution characteristics of three small-layer channels in the He 1 gas reservoir are finely depicted, and combined with the gas-bearing prediction results, the gas layer is clarified.


    Based on the integrated research work of geology and geophysical prospecting, the No.
    4 channel of the He 1 gas reservoir in this area is selected as a favorable target area.
    Differentiated deployment and mixed well type development are carried out according to the sand body superimposition and gas layer development characteristics
    .


    A batch of well positions such as J30-4-P9 were deployed and designed.


    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.