-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
China Petrochemical News Network reported on October 12, Southwest Petroleum Bureau Weiye 32-3HF well was drilled three times to a depth of 5390 meters with a drill bit out of the well and completed.
Well Weiye 32-3HF is the second phase development well group of Weirong.
The well was designed by the Petroleum Engineering Technology Research Institute of Southwest Petroleum Bureau, and the 50129 well team of Chongqing Drilling Company was drilled
(Zhu Liping, Li Hui, Wang Xiaojun)