Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
1.
Customers should be specific in the application of high and low temperature tests, and cannot casually say the high temperature category, which leads to doubts for the construction party and increases the total number
of kinetic energy design schemes.
For example, a standard specification of the walk-in high and low temperature alternating test chamber, if it is designed according to 40 degrees, will only have to be 6.
0KW of heating output power, but if it is made according to the 70 degree design, it must be at least 7.
5KW of heat
.
In this way, the 40-degree design scheme method is more costly of raw materials and increased heat than the 70-degree design scheme method
.
2.
The thermal insulation characteristics of the walk-in high and low temperature alternating test chamber must be done well
.
This must be done on the thermal insulation library
.
This is actually done by every manufacturer of walk-in high and low temperature alternating test chambers
.
Only some customers save capital construction costs and save the surrounding thermal insulation maintenance structure, which will also lead to the outflow of heat during the operation period and increase the output of heat generation during temperature control
.
3.
When the walk-in high and low temperature alternating test chamber is in operation, the centrifugal fan of the circulation system must be continuously operated, which is a piece
of the walk-in high and low temperature alternating test chamber that has a relatively large energy consumption loss during the operation period.
This line of environmental protection and energy saving is more visual, whose overall wind motor output power is smaller, whose environmental protection and energy saving is more high (in the same situation as adding heat).
4.
In actual operation, the walk-in high and low temperature alternating test chamber should try to avoid the frequency of opening and closing the door, and the greater the frequency of the opening and closing door, the greater the damage to the
heat generation.
The above points, if you do a good job, I believe that customers will have a more environmentally friendly and energy-saving walk-in high and low temperature alternating test chamber when applying!