-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Since entering the flood season, the Cementing Branch of Southwest Petroleum Engineering Company has attached great importance to flood prevention and flood prevention, layered consolidation of responsibilities, adopted effective measures, early deployment, early monitoring, and early drills to make preparations for flood prevention and flood control to ensure Safe production during the flood season
.
Deploy early to strengthen risk identification and control
.
The branch company deployed in advance, established a flood prevention and flood prevention leading group, and formulated the "Natural Disaster Emergency Plan"
Organize on-the-job employees to carry out training on flood prevention, lightning and electric shock prevention, and traffic accident prevention to enhance their awareness of prevention during flood seasons
.
Adhere to the 24-hour on-duty system for leaders to handle abnormal situations in a timely manner
Monitor early and actively prevent emergencies
.
Clean up the water ditches around the buildings in the work area and living area of the base to ensure that the flood discharge and drainage ditches are not blocked; monitor the water level of the water ditches around the base at any time to clarify the evacuation route
Carry out advance inspection of key parts and links such as the base storage warehouse and the safe power use of the base.
The emergency warehouse of the base has sufficient material reserves and special personnel for management and maintenance; adhere to the complex roads first to survey and then drive out, and organize experienced drivers to conduct on-site inspections Road, formulate detailed driving routes and traffic plans for special sections, and communicate them to the drivers participating in the construction in a timely manner
.
Signed a meteorological service agreement with Deyang Meteorological Bureau.
In case of sudden weather changes, the Meteorological Bureau will notify as soon as possible, assign a special person to collect the weather forecast of the base and surrounding areas, and issue risk notifications through the work group in a timely manner, so that the construction team can understand the weather conditions in advance , And make full preparations for flood control
.
Drill early to test emergency response capabilities
.
The grassroots teams carried out emergency drills during the flood season in accordance with the actual conditions of the base
The exercise plan was deduced from the desktop to the actual combat.
(Wang Le)