-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News Network, as a refining and chemical company, to do a good job of safe production is the biggest practical thing for the private sector
.
In accordance with the requirements of General Manager No.
Focus on construction and take multiple measures to ensure safety
Each device of the structural adjustment project has entered the start-up stage one after another.
To ensure the safe and stable progress of the start-up, the Second Refinery Department uses the daily shift time to publicize and implement the company's safety work plan.
The process, equipment, and safety professions conduct spot checks on the post training situation, and In the department group, the safety knowledge points are updated every day to improve the safety awareness of the team members
.
During the start-up phase of a special period, the on-site construction is implemented to upgrade the management level, and the local responsible departments will conduct a JSA analysis of high-risk operations one day in advance.
Special investigation, party building and joint construction to eliminate hidden dangers
Refining Department 2 and Refining Department 3 prepared for the start of the new installations, carefully organized a team of party members and construction unit personnel to give full play to the advantages of party building and joint construction, and carry out electrostatic grounding, expansion joints, supports and hangers, static sealing points, etc.
The special inspection and the practice of writing the names of the airtight personnel on the flanges were fully affirmed by the company's leaders
.
At each installation site, the construction unit and local employees took care and care to keep the working environment clean and tidy, and let the party flag fly high on the front line
Strengthen guardianship, guarding safety is guaranteed
The key construction work at the start-up stage requires the implementation of dual guardians.
In order to strengthen the implementation of the guardian’s duty performance, each device safety management profession has issued guardian duty cards, which can be carried along with the duty list, and put forward a clearer view of the on-site guardianship work.
Guidance
.
"When signing the work ticket, during the guardianship process, take out the guardian's duty card, take a look, remind yourself, check and check, what other safety measures are not in place, timely rectification, so that the guardianship can truly ensure safety Role
Pay attention to training and improve skills to help start work
According to the actual situation that most of the existing employees of the new device are college students who have recently graduated, the relevant departments of the new project actively organize personnel training, carry forward the fine tradition of teaching apprentices, and use the opportunities of on-site pumps to start trial operation and process flow through to implement field teaching , Emergency drills, accident rehearsals, and desktop deductions, from theory to practical operation, to improve the operating skills of the employees of the new installation in various ways, so as to better assist the smooth start of the work
The safe and stable start of construction of the structural adjustment project is currently the top priority of Beihai Refining and Chemical Company.
(Li Haijiao)