echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Petrochemical News > The natural decline rate index in the old area of ​​Jianghan Oilfield is improving

    The natural decline rate index in the old area of ​​Jianghan Oilfield is improving

    • Last Update: 2021-08-09
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    From January to June this year, the natural decline rate in the old area of ​​Jianghan Oilfield was 5.
    74%, which is 0.
    78 percentage points lower than planned and 0.
    65 percentage points lower than the previous year, which is the best level in the past decade
    .

    After decades of development, Jianghan Oilfield has problems such as difficulty in well pattern adjustment in old areas, difficulty in improving water quality along the way, and difficulty in upgrading development technology
    .


    This year, the oilfield has made continuous efforts to clarify the key tasks of controlling decline, improve the quality of oilfield water injection, and promote polymer flooding field trials, and make every effort to control the natural decline rate


    Carry out in-depth water injection surveys
    .


    The number of wells, daily oil production, and the proportion of oilfields affected by imperfect injection and production, vertical strata contradictions, low-efficiency and ineffective water injection, and edge and bottom water and injected water propulsion, and the number of wells, daily oil production, and proportions are determined to clearly control the decline of key wells


    The institute-factory joint office was initiated under the organization of the development department, worked together to find problems, worked together to formulate prescriptions, formulated fine injection and production adjustments, shut down wells and casing damaged wells, maintenance operations, and water quality management.
    The Four-Five-Five" Control Decrease Plan
    .

    Strengthen the follow-up evaluation, establish a management account, and steadily promote the implementation of various measures
    .


    At present, 88.


    Grasp the water quality of injection water to improve
    .


    Through sampling and comparison at the wellheads of each site, the direction and goal of improving the water injection quality of the oilfield are clearly defined


      Strengthen the analysis of the factors affecting the deterioration of water quality along the route, optimize the 14 districts of the Bamian River, and create a fine water injection demonstration by optimizing the water injection pipeline network, optimizing the dosage of chemicals, and optimizing the water injection management
    .

      Strengthen monitoring and upgrade water quality, upgrade site monitoring to site + wellhead sampling monitoring, release monitoring bulletins every quarter, and issue early warnings to various oil production plants around water quality factors such as pipeline aging, pipe wall pollution, equipment status, and process operation.
    Suggestions for improving water quality and improving chemical dosing schemes.
    Up to now, key indicators such as suspended solids, oil content, and corrosion have been significantly improved
    .

      Actively promote the polymer flooding field test in Mian 1 block of Bamianhe Oilfield
    .


    Be responsible for experts, manage by dedicated personnel, discuss professionally, and publish a bulletin every week


      (Xie Jiang, Wu Hua, Peng Xiaoming, Zhang Ning)

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.