-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News Network reported in early June, with the return of the original gas heating furnace equipment of Gudong 827-13 Well, the first solar thermal storage heating device of Shengli Oilfield Gudong Oil Production Plant was successfully installed, debugged and put into operation
The device has a significant heating effect for wells with long crude oil transportation distance, high viscosity, high wax content, and high freezing point.
Up to now, the outlet temperature of the application well of the device has stabilized at 50 to 59°C, which is 33°C higher than the temperature before installation.
(Pan Min Hu Jianjun)