-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Recently, the first bow-shaped horizontal well J30-4-P11 deployed by the Exploration and Development Research Institute of North China Petroleum and Petrochemical Company has achieved high production and a daily gas production of 123,000 cubic meters, which further confirms that the integration of geology and geophysical exploration has finely portrayed the central beach.
The He 1 Member is the main formation in the Jin 30 well block of the Dongsheng Gas Field, but the reservoir heterogeneity is strong, and the center banks are small and scattered
The actual horizontal section of Well J30-4-P11 is 800 meters long, and the sandstone drilling encounter rate is 95.
The successful implementation of the well is the result of the integration of geology, geophysical prospecting and engineering.
(Li Xueqing)