-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
At the end of December 2018, telecom operators met in Dubai to sign the Construction and Maintenance Agreement (CMA) for Africa-1, which aims to connect Africa with the Middle East and Southeast Asia and interconnect
with Europe.
According to reports, the new system will use 100G technology and will be equipped to adapt to terascale capacity
.
The system will have at least one three-fiber pair core extending over 20,000 km and is expected to make aviation-neutral PoP landings in Marseille (France), Mombasa (Kenya) and Durban (South Africa), with landings planned in Egypt via Port Sudan (Sudan), Jeddah (Saudi Arabia), Djibouti City (Djibouti), Mogadishu (Somalia), Mombasa (Kenya), Mayotte, Mahagaga (Madagascar), Fujairah (United Arab Emirates) and Karachi, Pakistan
。
According to the plan, the Africa No.
1 submarine cable system will be ready to be put into production
in 2021.
At the end of December 2018, telecom operators met in Dubai to sign the Construction and Maintenance Agreement (CMA) for Africa-1, which aims to connect Africa with the Middle East and Southeast Asia and interconnect
with Europe.
According to reports, the new system will use 100G technology and will be equipped to adapt to terascale capacity
.
The system will have at least one three-fiber pair core extending over 20,000 km and is expected to make aviation-neutral PoP landings in Marseille (France), Mombasa (Kenya) and Durban (South Africa), with landings planned in Egypt via Port Sudan (Sudan), Jeddah (Saudi Arabia), Djibouti City (Djibouti), Mogadishu (Somalia), Mombasa (Kenya), Mayotte, Mahagaga (Madagascar), Fujairah (United Arab Emirates) and Karachi, Pakistan
。
According to the plan, the Africa No.
1 submarine cable system will be ready to be put into production
in 2021.