-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
The Thai Petroleum Clean Oil Project undertaken by the Tenth Construction Company of Sinopec Refining and Chemical Engineering Group is mainly responsible for the capacity expansion of the Thai Petroleum refining unit and the upgrading and transformation of oil products
.
As the first project of Shijian Company to enter the Thai market, the project achieved a "zero" breakthrough in the Southeast Asian market, making Shijian Company's overseas market present a three-pronged trend in the Middle East, North Asia and Southeast Asia
.
High-level automated welding is a powerful tool in the construction market of Rio Tinto Petrochemical Engineering Co.
, Ltd.
of Ten Construction Company
.
However, it is not easy to transplant and copy the automatic welding operation mode of domestic projects to foreign projects
.
The machine problem has just been solved, and the human problem is now before us
.
The project department decided to quickly train an automatic welding team composed of local people to maximize the effectiveness of automatic welding
.
As of the end of July 2021, the project department has put into use 8 automatic welding machines, and has completed automatic welding of pipes with a diameter of 110,000 inches, with a welding efficiency of up to 1,500 inches per day
.
Mullen introduced that the subcontractor saw the production efficiency and "construction bonus" brought by automatic welding, and actively requested the configuration and use of automatic welding machines, and actively cooperated with the project department to promote the cultivation and reserve of Thai welders
.
The project department also used the advantages of automatic welding technology as a bargaining chip to negotiate with subcontractors.
By reducing the unit price of prefabrication, it saved more than US$500,000 in subcontracting costs, and finally achieved mutual benefit and win-win results
At present, the project is in the stage of steel structure and equipment installation, and mass modular installation has become a key point of management and control
.
The Chinese and Thai employees also formed a partner, the team looked completely new, and the Thai employees' construction ability and motivation were significantly improved
.
The project department planned a total of 105 modules with a total weight of more than 24,000 tons
.
In line with the principle of "the optimization of the construction plan is endless", the project department has formulated a detailed module installation plan, which reduces the cross operation between the construction area and the production area, which is safe and efficient
.