-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Stena Renewable AB announced that it has secured an order
for 72 MW of wind turbines from Sweden.
Vestas will be responsible for supplying 16 V136-3.
45 MW wind turbines, with 3.
6 MW increased to 3.
8 MW for the Kronoberget wind project
.
Three additional V136-3.
45 MW turbines are used in this power-optimised mode for the Fjällberget wind project
.
This V136-3.
45 MW of different power modes and full utilization of the allowable total height ensures a high capacity factor and helps both projects maximize energy production
based on specific wind conditions.
The addition of V136-3.
45 MW wind turbines has helped Sweden get off to a strong start in the low-speed market, with more than 740 MW of orders to date, making Sweden the world's largest V136-3.
45 MW market
.
CEO of Stena Renewable AB said, "Stena and Vestas have had a strong and long-standing relationship
for more than a decade.
Vestas has proven to provide high availability across our operational assets, the result of
high-quality products and strong day-to-day operational performance.
To be able to realize projects in today's demanding market, the right product needs to be delivered at the right price as well as long-term availability
.
Vestas offers all turbine equipment
that meets these conditions with modern technology and available power optimization modes for the V136-3.
45 MW turbines.
We look forward to continuing our strong partnership
with the Kronoberget and Fjallberget projects.
" ”
The President, Vestas Northern and Central Europe, added, "We are delighted to continue our close relationship
with Stena Renewable by providing world-class turbine solutions.
Thirdly, Vestas' strong and proven technology ensures that the project strengthens our market leading position
in Sweden in a challenging market environment.
”
These contracts include the supply, installation and commissioning of wind turbines, as well as a 25-year Active Output Management 5000 service agreement
.
Delivery of the wind turbines is expected to begin in the second quarter of 2019, with commissioning scheduled for the third quarter of 2019
.
(This article first published cable network: /, please indicate the source for reprinting)
Stena Renewable AB announced that it has secured an order
for 72 MW of wind turbines from Sweden.
Vestas will be responsible for supplying 16 V136-3.
45 MW wind turbines, with 3.
6 MW increased to 3.
8 MW for the Kronoberget wind project
.
Three additional V136-3.
45 MW turbines are used in this power-optimised mode for the Fjällberget wind project
.
This V136-3.
45 MW of different power modes and full utilization of the allowable total height ensures a high capacity factor and helps both projects maximize energy production
based on specific wind conditions.
The addition of V136-3.
45 MW wind turbines has helped Sweden get off to a strong start in the low-speed market, with more than 740 MW of orders to date, making Sweden the world's largest V136-3.
45 MW market
.
CEO of Stena Renewable AB said, "Stena and Vestas have had a strong and long-standing relationship
for more than a decade.
Vestas has proven to provide high availability across our operational assets, the result of
high-quality products and strong day-to-day operational performance.
To be able to realize projects in today's demanding market, the right product needs to be delivered at the right price as well as long-term availability
.
Vestas offers all turbine equipment
that meets these conditions with modern technology and available power optimization modes for the V136-3.
45 MW turbines.
We look forward to continuing our strong partnership
with the Kronoberget and Fjallberget projects.
" ”
The President, Vestas Northern and Central Europe, added, "We are delighted to continue our close relationship
with Stena Renewable by providing world-class turbine solutions.
Thirdly, Vestas' strong and proven technology ensures that the project strengthens our market leading position
in Sweden in a challenging market environment.
”
These contracts include the supply, installation and commissioning of wind turbines, as well as a 25-year Active Output Management 5000 service agreement
.
Delivery of the wind turbines is expected to begin in the second quarter of 2019, with commissioning scheduled for the third quarter of 2019
.
(This article first published cable network: /, please indicate the source for reprinting)
/