-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
China Petroleum & Chemical News.
com "Source control quality, technology improvement, operation quality assurance" is a quality management "package" launched by the Southwest Downhole Workover Team in the process of "surviving by quality and developing by market".
The team uses engineering systems.
Thinking method, to optimize the closed-loop management of the three links of "plan formulation-technical clarification-operation management and control", and strive for excellence in project quality
.
Aiming at the key processes of key links, the team formulated detailed construction technical plans in advance, refined the responsibilities of the construction steps, decomposed the processes to the head, and implemented the operations to the details
.
For complex wells, key wells or key processes and new process wells, the team actively strengthened communication and coordination with the Downhole Technology Research Institute, changed post-event treatment to pre-prevention, and invited designers to the site to carry out design confession, effectively avoiding design The problem caused a complicated situation on site
In terms of technical clarification, before construction, technicians will provide detailed technical clarifications to on-site operators regarding project characteristics, construction methods, technical measures, process connections, quality standards, safety risks and preventive measures, so that everyone can understand the construction needs in advance.
Control the process, process, quality and safety precautions, implement the response plan, and avoid quality accidents to the greatest extent
.
In terms of operation management and control, the team has compiled the "Employee Post Safety Operation Manual" to refine and standardize the common operating skills and operating behaviors of employees in each position
.
In the past two years, the workover team has achieved 100% of the success rate of overhaul, the first pass rate of construction, and the complete data accuracy rate without any engineering accidents
(Yin Xiang)