-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News Network reported on July 13, good news from the Yongye 10 platform.
The Yongye 10-2HF well is designed with a depth of 5942 meters and a horizontal section of 1500 meters.
In order to promote drilling production safely and steadily, the company pays more attention to it, in accordance with the requirements of the "two specials and two important periods", combined with the technical points of "one well, one strategy, one section, one strategy, and one sequence, one strategy" to continuously strengthen the basic guarantees at all levels of the well.
The drilling team strictly implements the company’s unified management, earnestly implements the "General Manager 2# Order", "Five Checks and Five Stricts" and the Yongye 10 Platform HSE Site Promotion Meeting and other work spirits, and strengthens the "three systems" management and the "four walks" "The work intensity, combined with the drilling situation of the Yongye 10-1HF well, refines the links and process performance, takes well control as the most important link, and pays close attention to the intensification of the liquid level for the increase in the total hydrocarbon value.
(Zhang Hongwei, Tang Tao and Wang Chengwen)