echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Petrochemical News > Shengli Petroleum Engineering Sets the Record of the Shallowest Vertical Depth of Western Horizontal Well Completion

    Shengli Petroleum Engineering Sets the Record of the Shallowest Vertical Depth of Western Horizontal Well Completion

    • Last Update: 2021-09-19
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Recently, the Xinchun Company Pai 609-Ping 2 well, supported by the Drilling Technology Research Institute of Shengli Petroleum Engineering Company, was successfully completed, setting the record of the shallowest vertical depth of the horizontal well in the west of Shengli, and successfully exploring the horizontal well screen for heavy oil.
    The experience of tube completion steam flooding has laid a solid foundation for the subsequent development of Block Pai 609
    .

    Well Pai 609-Ping 2 is a pilot test well deployed by Xinchun Petroleum Company in Block Pai 609 of Chunfeng Oilfield, which was drilled by the 30 teams of the Xinjiang Project Department of Shengli Engineering Downhole Operation Company
    .


    Block Pai 609 is a heavy oil and is planned to be developed by steam flooding with horizontal well screen completion.


    The Shengli Engineering Drilling Institute was anxious for the first party.
    Aiming at the main construction difficulties of the well, such as the shallow deflection point, shallow reservoir depth, large strata change and abnormal deflection rate, and thin high-quality reservoirs, the simulation analysis and process optimization were carried out, combined with the past vehicles.
    Experiencing the construction of super shallow horizontal wells in the sub-work area, carefully drafting the construction plan
    .


    The plan uses conventional truck-mounted drilling rigs, optimizes the well depth structure, customizes the large-curved special structure screw, selects geo-steering tools suitable for high dog legs, optimizes the drilling fluid performance, optimizes the completion string structure and other measures to achieve low-cost horizontal well drilling and completion Ways to develop ultra-shallow heavy oil reservoirs in this block


    During the construction process, the technicians of Shengli Engineering Drilling Institute actively communicated and cooperated closely with the 30 team of the Xinjiang Project Department of the Xinjiang Project Department of Shengli Engineering Downhole Operation Company, and used small displacement and large camber screws to build the angle of one-opening and two-opening.


    (Wang Ning, Dong Zhihui, Zhu Jing)

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.