-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
According to the news from Sinopec News Network, in response to the recent rains and frequent flooding of disasters, in the past few days, the Dongxin operation area of Shengli Oilfield Downhole Operations Center has been actively preparing for war, formulating work plans for safe production during the flood season, compacting responsibilities, and in-depth safety education , Weather warning, responsibility implementation, and emergency prevention "four strengthening" work, build a "protective wall" for production during the flood season, and provide safety guarantee for the quality and efficiency of operations
.
Strengthen safety education
.
The operation area actively carries out safety training in the rainy season to allow employees to fully understand the characteristics of safety production in the rainy season, the adverse effects of extreme weather on safety production, and preventive measures and precautions
.
Strengthen weather warning
.
The operation area establishes a rainy season weather warning mechanism, releases warning information in time, pays close attention to the weather conditions, keeps abreast of weather change information, and predicts the prevention of thunderstorms and winds, and uses the petrochemical communication team to timely issue warnings such as strong winds and thunderstorms.
, Formulate preventive measures in advance, strictly implement the 24-hour duty system, clarify the duties and obligations of the leaders and personnel on duty, strengthen the preparation of emergency rescue materials, and ensure that all safety precautions are in place during the rainy season
Strengthen the implementation of responsibilities
.
The work area further improved and perfected the "Safety Production Responsibility System", clarified the QHSE responsibilities and risks of each post, and implemented it at various levels
.
Strengthen emergency preparedness
.
The operation area refines the rainy season safety production measures, further revises and perfects the emergency response plan, achieves early deployment, early detection, early launch, early preparation, conducts rainy season emergency drills, and improves the supervisory personnel's ability to deal with emergencies
.
(Bi Guoping and Xu Liangliang)