-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Recently, the fourth well of the Shanghai Bureau Exploration No.
In order to gnaw this hard bone, the platform equipment department used the gap of the pre-connected drilling tools before drilling, replaced a large number of worn and aged hydraulic pipelines, restarted the drilling system, eliminated the electronic ring network alarm failure, and provided equipment protection for subsequent operations
The well team department conducts training on drilling design and well control design with full coverage, clarifies various risks on geological horizons and precautions for equipment operation, in-depth study and discussion of various problems that may arise in the construction of this well, and Propose solutions or backup plans in a targeted manner, and do a two-pronged approach to ensure the smooth progress of follow-up operations with equipment and technology
In this high-difficulty well operation, all employees of Exploration No.
(Jiang Yan)