-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
On June 22, Xu Guoqing, the squad leader of the Shunding workshop of Qilu Petrochemical Rubber Plant, was putting the rubber scattered on the ground receiving bag back on the conveyor belt
.
"This is one of the contents of the special labor competition to improve quality and efficiency that we have carried out since March
.
Different from the labor competition with small indicators, the special competition makes management more targeted
.
" Yang Zhi, deputy secretary of the Party branch of the Shunding workshop Let employees participate in the special labor competition to improve quality and efficiency
.
In order to improve the cooperation of the three sections of the pre-process, the drying post and the packaging line, the Shun Ding workshop launched a special labor competition around the three indicators of output, quality and loose glue rate
.
They are rewarded according to the comprehensive ranking to maximize the enthusiasm of employees to create results
.
Since the launch of the special labor competition, the workshop has increased rubber production by nearly 100 tons per month, and the quality of butadiene rubber has also increased from 93.
5% to 94.
5%, the best level in recent years
.
Faced with the continuous rise in butadiene prices and the shrinking profit margins of rubber products, rubber factories have switched to “track” and adjusted their strategies flexibly, coordinating the purchase of cracked C4 raw materials, reducing outsourcing and switching to self-produced butadiene, reducing costs and increasing efficiency.
.
The rubber factory is actively coordinating the entry of raw materials into the factory, and the butadiene workshop is running at full capacity, striving for safe and stable production under high load
.
In order to increase the self-production of butadiene, the workshop has carried out technical research on improving butadiene yield
.
They formulate optimization measures, track their implementation on a weekly basis, and adjust them at any time
.
After one month, the butadiene yield has increased from 98.
2% to 98.
5%
.