-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News Network reported on the afternoon of August 23, Puguang Branch's Natural Gas Purification Plant Second Joint Second Series Maintenance Equipment successfully introduced raw gas and successfully resumed production
.
This second joint overhaul has completed more than 900 overhaul projects and technical transformation projects including liquid flow tank reconstruction and tower repair; during the overhaul period, the natural gas purification plant optimized the construction nodes, strictly controlled the operation safety, strictly controlled the quality of the overhaul, and jointly organized the overhaul work.
Temporary party branch, build a strong battle fortress, improve the service guarantee system, integrate the achievements of party history learning and education with the maintenance work, and ensure the high-quality and efficient completion of the equipment maintenance work
.
In mid-August, in accordance with the production requirements of the Puguang Gas Field, the second joint overhaul device entered the preparation stage for resumption of production after the conditions were confirmed
.
After the oilfield held a mobilization meeting for the "Winning Reserves, Increasing Production and Efficiency" action, the plant used WeChat, special meetings and other forms to organize timely publicity and implementation, and improve its political position
.
After careful regulation, various parameters of this series are currently operating normally
.
It is reported that a series of preparations for the resumption of production are being carried out in an orderly manner.
It is planned to start air bleed operation in early September and the full resumption of production of the device will provide a solid guarantee for sprinting annual production and operation tasks and achieving the goal of "increasing reserves, increasing production and increasing efficiency"