echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Petrochemical News > Puguang Gas Field Second Joint Second Series Maintenance Equipment Successfully Resumed Production

    Puguang Gas Field Second Joint Second Series Maintenance Equipment Successfully Resumed Production

    • Last Update: 2021-09-04
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Sinopec News Network reported on the afternoon of August 23, Puguang Branch's Natural Gas Purification Plant Second Joint Second Series Maintenance Equipment successfully introduced raw gas and successfully resumed production
    .

    This second joint overhaul has completed more than 900 overhaul projects and technical transformation projects including liquid flow tank reconstruction and tower repair; during the overhaul period, the natural gas purification plant optimized the construction nodes, strictly controlled the operation safety, strictly controlled the quality of the overhaul, and jointly organized the overhaul work.
    Temporary party branch, build a strong battle fortress, improve the service guarantee system, integrate the achievements of party history learning and education with the maintenance work, and ensure the high-quality and efficient completion of the equipment maintenance work
    .

    In mid-August, in accordance with the production requirements of the Puguang Gas Field, the second joint overhaul device entered the preparation stage for resumption of production after the conditions were confirmed
    .
    After the oilfield held a mobilization meeting for the "Winning Reserves, Increasing Production and Efficiency" action, the plant used WeChat, special meetings and other forms to organize timely publicity and implementation, and improve its political position


    .


    After careful regulation, various parameters of this series are currently operating normally
    .
    It is reported that a series of preparations for the resumption of production are being carried out in an orderly manner.


    It is planned to start air bleed operation in early September and the full resumption of production of the device will provide a solid guarantee for sprinting annual production and operation tasks and achieving the goal of "increasing reserves, increasing production and increasing efficiency"


    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.