-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News Network News As of July 23, the equipment management office of the Northwest Oilfield Yakela Gas Production Plant actively promoted idle equipment, found a home, and completed two idle assets of 1 belt pumping unit and 1 water injection pump.
The allocation work has completed the oilfield company's annual target tasks ahead of schedule, increasing the efficiency by 376,900 yuan
.
Since the beginning of this year, the factory has continuously strengthened the detection of idle supporting equipment, checked aging and inefficient equipment, and low utilization equipment, regularly summarized the reasons for equipment idleness, determined the direction of equipment use, and improved equipment utilization
.
A few days ago, the Shunbei project department urgently needed a water injection pump according to the production deployment.
They promptly purchased the idle water injection pump of the Yakla Gas Plant in the "Idle Equipment Simulation Supermarket" of the equipment management platform, and supplemented it in time without delaying production
.
It is reported that since the beginning of this year, the factory has improved the knowledge and operational capabilities of equipment managers and operators through self-reinforcing learning and professional training, and implemented the "four in place" and "three clears" on site management, and focused on cultivating key equipment Maintenance experts, leading all levels of management and post personnel to participate in the whole process of independent maintenance of equipment
.
At the same time, the factory cooperated to optimize the structure of technical service personnel, breaking the professional boundaries of "machinery, electricity, instrumentation, management, and operation".
Managers and post personnel at all levels participated in the independent maintenance of equipment throughout the process, and cooperated with the maintenance personnel to maintain joint maintenance.
, Maintenance equipment
.
For new equipment, the on-site technical service team is required to intervene in advance, fully prepare, master the maintenance technology of similar equipment as soon as possible, and accumulate practical experience
The plant also further improved the system, including job standards for on-site management of equipment, including inspections, standardized operations, and maintenance, and compiled and improved the "Compilation of Equipment Safety Operation and Maintenance Regulations" for the gas production plant
(Zhu Fangning and Cao Xinwei)