-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
At the same time, the management area also improves work efficiency by optimizing processes.
For broken rod oil wells, if conditions permit, check the salvage rod instead of the pump.
Implementation of broken rod fishing operations for 1 well time, single well time shortening the operation cycle by 2 days, saving operation costs of 20,000 yuan; for stuck pump wells, detailed analysis of stuck pump types, and resolutely adopted large displacements for the wells caused by wax stuck.
The hot wash was used to release the jam.
A total of 3 wells were implemented, and 2 wells were successfully completed, saving more than 70,000 yuan in cost.
In addition, the oil well management responsibilities are decomposed to every management cadre, technician, and team staff in the oil production area, so that everyone has indicators on their shoulders to ensure stable production and longevity of oil wells.
"Changshou wells" in this area accounted for 25% of the total number of wells opened.
There were 8 "Shouxing wells" with a repair-free period of more than 1200 days, of which the repair-free period of ND17-3 well was as long as 2207 days.
(Fu Xukai, He Long, Chen Wei)