-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
China Petrochemical News Network News Since June, Maoming Petrochemical’s Instrumentation Control and Metrology Department has conscientiously implemented the spirit of the group company’s "Emergency Notice on Strengthening Work Safety in Special Periods", deeply analyzed the weak links of production management, and consolidated the responsibilities of leaders at all levels.
Keep an eye on the performance of your duties on the spot and do the above rate
Pay close attention to the pre-inspection of cadres and conduct actual risk investigation
On June 8th, at the Ministry’s dispatch meeting, Wang Ziyang, the manager of the Metering Department, announced the implementation of the "6 hours on-site" work requirement, that is, the working time of leaders at all levels is guaranteed to be 6 hours in the work area, grassroots teams and groups to supervise, guide and solve problems.
As of June 18, leading cadres at all levels took the lead in identifying more than 70 problems on site, and conducted strict assessments against typical problems such as irregularities in the approval process for 3 changes in the chemical operation area, in accordance with the "Detailed Rules for the Implementation of the Voting Operation Law of the Instrument Control and Metrology Department"
Pay close attention to the establishment of reforms, and do practical management of hidden dangers
From June 15th to 18th, four members of the Ministry’s leadership team personally led the team, leading technical backbones and management personnel at all levels in the management offices and operation areas to the oil refining, chemical, and port areas, as well as Zhanjiang First Station, Huazhou Station, etc.
At the same time, a comprehensive maintenance test was carried out on the storage tank control system
At present, in order to further strengthen the closed-loop management of the control of hidden instrument hazards, the instrument control and measurement department has formulated a professional supervisory supervision system to implement two aspects of various hidden hazards.
(Liang Yanping)