echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Petrochemical News > Maoming Petrochemical strictly controls the four passes to ensure that the qualified rate of oil products reaches the standard

    Maoming Petrochemical strictly controls the four passes to ensure that the qualified rate of oil products reaches the standard

    • Last Update: 2021-09-12
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    News from China Petrochemical News Network Since this year, Maoming Petrochemical has strictly controlled the four levels of oil sampling, dehydration, storage and delivery, and controlled the quality of oil.
    In the first eight months, it has transported 8.
    678 million tons of oil products out of the factory.
    There have been no complaints from users and no quality incidents.
    Achieve 100% pass rate of oil products
    .

    Strictly check off oil sampling by visual inspection
    .
    The oil should be sampled and observed before entering the tank and sending the oil.


    Once the oil is found to be turbid and unclear, report it for treatment immediately


    Strictly shut off the dehydration of the oil tank
    .
    Regarding the water content of the incoming oil, the oil loading workshop strictly implements the "five dehydration" regulations, namely dehydration before oil collection, dewatering by sedimentation after oil collection, dehydration during daily inspection, dehydration before moving, and dehydration after passing the test


    .


    Strictly control the storage of oil products
    .
    Clean oil tanks and filters regularly, keep containers clean, strictly control oil inventory temperature, reduce oil volatilization, prevent oil oxidative deterioration, and implement special tanks and dedicated lines for storage and use of oils of different properties


    .


    Strictly control the loading and leaving the factory
    .
    Workers are required to carefully inspect the tanker in accordance with the regulations of “three pairs, one look, five no installation, five no factory”.


    Once they find that there is water or impurities in the vehicle, which does not meet the requirements of the loading quality, immediately pull the ladder to seal to avoid installation.


    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.