echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Active Ingredient News > Drugs Articles > Maintenance method of mold incubator

    Maintenance method of mold incubator

    • Last Update: 2022-09-08
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    1.
    The shell of the incubator is effectively grounded.
    After use, the power supply should be turned off to ensure safe use
    .

    2.
    The incubator should be placed in a room with good ventilation, and no flammable and explosive materials should be placed around it
    .

    3.
    The items in the incubator should not be overcrowded and leave space
    .

    4.
    Consumables such as sealing rings, hot air motors, heating pipes, etc.
    are guaranteed for one month, and should be regularly maintained and cleaned of dust
    .

    5.
    It is not suitable for high voltage, high current, strong magnetic field, with corrosive gas (such as acid, alkali, sulfur substances), so as to avoid interference, damage and danger
    .

       6.
    To do a good job in the daily maintenance of the incubator, the use and maintenance should be carried out by full-time personnel, and the power supply should be cut off during maintenance to ensure safety
    .

       7.
    The inside and outside of the box should be kept clean frequently, and the plastic dust cover should be covered if it is not used for a long time, and it should be placed in a dry room
    .

       8.
    When the incubator is transported and moved, the inclination angle of the box body is strictly prohibited to be greater than 45 degrees
    .

       9.
    The incubator should be strictly prevented from damage to the operator by ultraviolet rays during use and sterilization
    .

       10.
    Water should be added for humidification of the incubator with humidity control, tap water should be added to add water, and distilled water should not be used to ensure humidity control
    .

    The water tank (plastic box) at the top of the incubator needs to be connected to the water inlet interface.
    After the connection is made, the air in the connecting pipe is emptied, and the power is turned on, so that the water in the water tank can smoothly enter the humidification water tank at the bottom of the incubator (at this time, the incubator is in a water shortage alarm state) , the water reaches the position of the water level alarm probe, and the alarm sound stops
    .

       11.
    After the humidification work, it is necessary to dry the incubator studio to ensure the correctness of the humidity requirements for working again
    .

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Related Articles

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.