-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News Network reported on June 24, the Qinghe Manager Department of Jianghan Oilfield Oil and Gas Production Engineering Technical Service Center organized supervisors to conduct special safety inspections on 8 contractors, and found incomplete safety equipment and inadequate monitoring of high-risk operations, etc.
Since the beginning of this year, the manager department has focused on the increase in the number of contractors, and its business scope includes underground operations, vehicle transportation, steam injection boiler maintenance, infrastructure construction and other fields.
Strictly grasp on-site management and lay a solid foundation for safety
In view of the contractor’s wide range of business, multiple sites, and uneven technical capabilities, the management department strictly implements the contractor’s site access system, insists on its safety and technical capabilities, the professional qualifications of the constructors, and the management status of the equipment.
Effectively strengthen on-site organization and coordination, adhere to daily on-site inspections and night inspections, and urge contractors to hold pre-shift meetings, make solid preparations for the start of work, work with certificates, and guardianship for high-risk operations.
Strictly grasp the special aspects of construction to ensure that risks are under control
Since the construction of each project will involve some special places and special links, the management department strictly requires the contractor to carry out the risk assessment before the start of the project, and actively promote the standardized safety supervision model.
Insist on focusing on human operation and management, requiring construction personnel not to move or malfunction during the construction of special links; to issue suspension instructions in time when “three violations” are found, and immediate rectification is required.
Strictly grasp the problem analysis and assistance to achieve a win-win situation for both parties
The management department insists on a monthly summary analysis of the problems found on the spot, analyzes the causes of frequent problems, multi-levels and multi-angles, evaluates and judges according to safety standards, and puts forward rectification opinions on the management problems of the contractor
On the basis of the analysis of the contractor’s problems, insist on arranging responsible and qualified supervisors for the contractors with weaker management, increase on-site supervision, and adopt the form of "passing, helping, and leading", what is missing, and what is missing? In what way, help the contractor team to do a good job in safety training and education, enhance the safety awareness of the contractor team's cadres and employees, and achieve a win-win situation for both parties
(Peng Zhie Dong Zhijun)