-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
China Petroleum & Chemical News Network News Since the beginning of this year, in order to reduce cost input and maximize benefits, the construction quality of operations has been effectively improved by optimizing construction design schemes, strengthening job site supervision and strengthening supervision and assessment.
Construction design is the quality standard followed by the job site, and good design review is the basis for improving the first pass rate of construction.
In view of the fact that the investment in fracturing measures is large and the construction is difficult, the technical supervision station personnel of the plant combined with years of fracturing supervision on-site construction experience, comprehensively considered from the two aspects of cost control and fracturing effect, optimized the measure plan, and achieved good results.
In March of this year, in order to improve the effect of fracturing measures for Well Total 3 Inclination-5-4, the technical personnel of the plant technical supervision station optimized the construction process and improved the content of the plan after careful discussion.
In addition, in order to enhance the quality awareness of the operation supervision personnel, the station combined with the actual work supervision work, clarified the duties and powers of the operation supervision departments at all levels, and strengthened the evaluation of the operation supervision.
(Li Xia Cheng Dongdong)