-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
[ Policies and Regulations of Chemical Machinery and Equipment Network ] Recently, the State Administration for Market Regulation issued a notice that it will organize the 2022 proficiency testing of national-level inspection and testing institutions (hereinafter referred to as "national-level proficiency testing") in some testing and inspection fields that the society focuses on
.
A total of 20 verifications are planned to be carried out this time, including 5 items of food safety, 2 items of consumer product safety, 3 items of electrical safety, 3 items of building material quality, 3 items of material testing, 2 items of ecological environment monitoring, and 1 item of medical protective equipment
.
Chemical Machinery and Equipment Network Policies and Regulations Chemical Machinery and Equipment.
A total of 20 verifications are planned to be carried out this time, including 5 items of food safety, 2 items of consumer product safety, 3 items of electrical safety, 3 items of building material quality, 3 items of material testing, 2 items of ecological environment monitoring, and 1 item of medical protective equipment
.
In 2022, the national-level proficiency testing work will require all provincial-level market supervision departments to organize the proficiency of industry inspection and testing institutions in accordance with the "Administrative Measures for the Qualification Accreditation of Inspection and Testing Institutions", "Measures for the Supervision and Administration of Inspection and Testing Institutions", and "Implementation Measures for Laboratory Proficiency Testing".
For verification or inter-laboratory comparison work, the cost of proficiency testing of nationally accredited inspection and testing institutions with relevant project inspection and testing capabilities shall be borne by the State Administration for Market Regulation
.
For verification or inter-laboratory comparison work, the cost of proficiency testing of nationally accredited inspection and testing institutions with relevant project inspection and testing capabilities shall be borne by the State Administration for Market Regulation
.
It is understood that each national proficiency testing project undertaking unit should submit the proficiency testing design plan before April 30, 2022, and submit the list of participating institutions, non-participating institutions list, sample information, statistical data and information before August 30, 2022.
Based on the evaluation results, the proficiency testing project summary acceptance and report preparation should be completed before October 31, and the proficiency testing project summary report and related technical materials should be submitted before November 10, 2022
.
In addition, each provincial market supervision department and each industry review team should submit the summary and related information of the organization and implementation of the proficiency test this year before December 10
.
Based on the evaluation results, the proficiency testing project summary acceptance and report preparation should be completed before October 31, and the proficiency testing project summary report and related technical materials should be submitted before November 10, 2022
.
In addition, each provincial market supervision department and each industry review team should submit the summary and related information of the organization and implementation of the proficiency test this year before December 10
.
Inspection and testing institutions refer to the inspection and testing of the quality, safety, performance, environmental protection and other indicators of the identified samples through professional technical means and instruments and equipment under the conditions of corresponding standards and technical specifications, and issue inspection and testing reports, so as to assess whether they comply with government, Industry and user standards and requirements in terms of quality, safety, performance,
etc.
Entrusted by government regulatory agencies, manufacturers or product users, this industry has high technical requirements and involves the integrated application of multiple disciplines such as chemistry, physics, materials, electronics, biology, and food science
.
etc.
Entrusted by government regulatory agencies, manufacturers or product users, this industry has high technical requirements and involves the integrated application of multiple disciplines such as chemistry, physics, materials, electronics, biology, and food science
.
In recent years, with the continuous expansion of China's subdivisions and increased attention in many fields, the market demand for inspection and testing services has also increased rapidly
.
As of the end of 2020, there were 48,919 inspection and testing institutions in China, an increase of 11.
16% over the end of the previous year; 567 million inspection reports were issued that year, and the industry achieved an annual operating income of 358.
592 billion yuan, an increase of 11.
19% over the previous year
.
.
As of the end of 2020, there were 48,919 inspection and testing institutions in China, an increase of 11.
16% over the end of the previous year; 567 million inspection reports were issued that year, and the industry achieved an annual operating income of 358.
592 billion yuan, an increase of 11.
19% over the previous year
.
In 2021, the State Administration for Market Regulation will organize the implementation of the proficiency testing project for national-level inspection and testing institutions, including 18 projects and 29 assessment inspection and testing parameters, involving a total of 2,733 national-level qualification accreditation inspection and testing institutions, and 2,566 qualified results.
The results failed 167 times
.
The inspection work clarified that the technical ability of inspection and inspection personnel needs to be improved, the use and maintenance of inspection equipment is improper, the inspection process and operation standardization is insufficient, and the understanding of the operation instructions is not thorough, which prompted the industry to check and fill the gaps
.
The 2022 national-level proficiency testing will further standardize the inspection and testing market on the basis of previous work, improve the technical capabilities of inspection and testing institutions, and promote the development of the entire inspection and testing industry
.
The results failed 167 times
.
The inspection work clarified that the technical ability of inspection and inspection personnel needs to be improved, the use and maintenance of inspection equipment is improper, the inspection process and operation standardization is insufficient, and the understanding of the operation instructions is not thorough, which prompted the industry to check and fill the gaps
.
The 2022 national-level proficiency testing will further standardize the inspection and testing market on the basis of previous work, improve the technical capabilities of inspection and testing institutions, and promote the development of the entire inspection and testing industry
.