echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Petrochemical News > Implementation of the first domestic megaton carbon dioxide capture and utilization project

    Implementation of the first domestic megaton carbon dioxide capture and utilization project

    • Last Update: 2021-09-30
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Sinopec News Network reported on September 15, China’s first million-ton-level CCUS project completed by the Petroleum Engineering Design Company under Sinopec Petroleum Engineering and Construction Corporation-"Shengli Oilfield Gao 89-Fan 142 Area Carbon Dioxide Flooding and Storage Demonstration The preliminary design of the project was officially approved by the Shengli Oilfield Branch, marking the official entry into the implementation stage of the project
    .

    The CCUS in the Gao 89-Fan 142 area of ​​Shengli Oilfield is China's first million-ton-level CCUS full-industrial chain demonstration project, which can not only improve the carbon emission reduction capacity of enterprises, but also bring economic benefits to Shengli Oilfield in increasing production
    .

    Since the successful bidding of the CCUS project in Gao 89-Fan 142 area, the petroleum engineering design company quickly set up a project team, inverted the construction period according to the scheduled production target, and conducted wall chart operations
    .


    Faced with heavy tasks and urgent time requirements, the project team gave full play to the advantages of integration of survey and design to run the project in a battle state


    (Yin Qian and Han Juanjuan)

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.