    How to apply polyurethane insulation sound insulation system on the floor of the building.

    • Last Update: 2020-10-24
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    Background
    Ninghai Hot Springs Lijing Garden is the first commercial housing residential district in the town of Deep , Ninghai County, Zhejiang Province, the project is located in Ningbo City, Zhejiang Province, the second phase of the project consists of 9 residential buildings and 1 kindergarten. At present, the total volume of the second phase of the project has been completed more than half, is expected to be completed next year. The ground insulation project of the second phase of the Lijing Garden project uses shanghai's larger polyurethane insulation materials, and the larger shanghai construction team completes the spraying

    .
    use of products
    due to residential buildings on the building sound insulation effect is higher, the project uses the larger YD4530-F floor insulation special polyurethane.
    floor insulation sound insulation polyurethane products low thermal conductivity, paste strength, can protect the main structure of the building, increase the life of the building, effectively reduce moisture erosion of the building, and add modified graphite flame retardant, up to B1 flame retardant;
    floor ground insulation sound insulation system diagram
    construction steps
    construction process
    construction preparation
    site construction tools include: vacuum cleaner, interface sprayer, air nail gun, two-component polyurethane foam sprayer.
    treatment
    before the construction of polyurethane spraying, it is possible to clean up the floating ash, avoid dust, and keep the grass-roots flat and clean.
    brush interface agent
    the interface agent continuously and evenly sprayed on the grass surface, to prevent dust slag, shrink cracking and other adverse effects, enhance the base bonding force. The project uses oriental rain rainbow's Huasa PMC-500 multi-functional interface agent, with high penetration, high enhancement, multi-purpose characteristics.
    the construction of the
    protective layer, before the construction of the wall around the isolation protection, to avoid foam dispersion, pollution of the wall.
    spray polyurethane insulation insulation layer
    after the vertical isolation layer construction of the wall, spray hard bubble polyurethane insulation layer. Start a two-part polyurethane foam sprayer, wait for the liquid ratio to adjust to normal, formally began spraying operations, the atomized polyurethane foam sprayed on the floor of the floor, immediately formed a hard polyurethane foam of about 1 cm.
    rebar mesh laying
    polyurethane floor construction is completed within 20 minutes is strictly prohibited, cooked 24 hours later, rebar mesh laying.
    concrete protective layer pouring
    using C20 fine stone concrete for pouring, to ensure that the reinforced mesh in the middle of the thickness of the protective layer.
    the protective layer telescopic seam
    after the protective layer concrete has finally condensed, the telescopic seam cutting.
    construction steps of the ground insulation insulation system of the building were largely completed.
    .
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.