-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News Network reported on September 19 that the automatic welding unit for the second bid section of the Northeast Anhui Natural Gas Pipeline Project constructed by the petroleum engineering construction company Henan Oil Construction Company officially ignited and opened the automatic welding of the bid section.
Prologue
.
It is reported that the second bid section of the Northeast Anhui Natural Gas Pipeline Project contracted by the company has a total length of 68.
8 kilometers, of which 8.
53 kilometers use fully automatic welding technology
.
In order to ensure the smooth construction of the fully automatic welding unit, the company made overall arrangements, scientifically planned, and fully completed various preliminary preparations
The technical quality department of the project department has invited relevant experts to hold process review meetings many times to study and formulate a construction plan that can adapt to the construction environmental conditions and process requirements of the Northeast Anhui project
.
Before the start of construction, the project department actively organized fully automatic welders to conduct examinations to clarify the safety and technical quality of the crew members.
In order to ensure the smooth start of the fully automatic welding unit, the project department organized the construction in advance, intervened in advance to coordinate the land acquisition procedures, and carried out safety education and training on entry, and successfully passed the start-up inspection and acceptance organized by the owner and the supervisor.
The opening of welding marks the full-automatic welding construction of the project has entered the "fast lane"
.
(Feng Senbo)