-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
A few days ago, all 134 wind turbines of Jiangsu Qidong H1, H2, H3 offshore wind power projects were connected to the grid for power generation.
The construction of large-scale wind farms provides a promotion template
.
The project is located on the north side of the Yangtze River estuary in Qidong City, Jiangsu Province.
The center of the site is about 40 kilometers offshore, with a total installed capacity of 802 MW.
This project is EPC contracted by the East China Institute of Power Construction.
The project is under construction, facing the sea area with large swells, complex geological conditions, short construction windows during monsoon and typhoon periods, domestic offshore wind power "rush installation tide" and normalized epidemic situation To prevent and control multiple challenges such as tight schedules, the project team coordinated the organization and deployment, scientifically allocated resources, strictly controlled quality, progress and safety, and created "14 single pile sinking in a single month and single ship" and "31 wind turbine installations in a single month.
After the full capacity of the project is connected to the grid for power generation, it will provide nearly 2.
226 billion kilowatt-hours of clean electricity each year, save about 766,000 tons of standard coal consumption, and reduce carbon dioxide emissions by about 1.