-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Finnish ICT technology provider Cinia revealed that C-fiber Hanko will invest in Arctic Connect, an Arctic submarine cable system, to build a digital bridge
between Europe and Asia through the Northeast Corridor.
It is reported that the project, commissioned by the Finnish Ministry of Communications, will be operated
by Cinia.
At present, C-Fiber Hanko has connected the 1,200 km C-Lion1 submarine cable in Helsinki, the capital of Finland, with Mecklenburg in northern Germany and Helsinki
, the capital of Finland.
The C-Lion 1 submarine cable system consists of 8 pairs of optical fibers with a total capacity of 144Tbps
.
In addition, the Arctic Connect path may include a path connecting the Gulf of Bothnia and the Hanko Peninsula, the so-called C-Lion2 system
.
Therefore, once completed, the Arctic Connect submarine cable system will connect Europe, North America and Asia
.
According to current plans, the system will include six fiber pairs with a capacity of 60Tbps and a total length of 18,000 kilometers
.
Finnish ICT technology provider Cinia revealed that C-fiber Hanko will invest in Arctic Connect, an Arctic submarine cable system, to build a digital bridge
between Europe and Asia through the Northeast Corridor.
It is reported that the project, commissioned by the Finnish Ministry of Communications, will be operated
by Cinia.
At present, C-Fiber Hanko has connected the 1,200 km C-Lion1 submarine cable in Helsinki, the capital of Finland, with Mecklenburg in northern Germany and Helsinki
, the capital of Finland.
The C-Lion 1 submarine cable system consists of 8 pairs of optical fibers with a total capacity of 144Tbps
.
In addition, the Arctic Connect path may include a path connecting the Gulf of Bothnia and the Hanko Peninsula, the so-called C-Lion2 system
.
Therefore, once completed, the Arctic Connect submarine cable system will connect Europe, North America and Asia
.
According to current plans, the system will include six fiber pairs with a capacity of 60Tbps and a total length of 18,000 kilometers
.