echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Coatings News > Paints and Coatings Market > Feedback from environmental protection inspectors: Sichuan has achieved important results in rectification, but some of them have not met expectations

    Feedback from environmental protection inspectors: Sichuan has achieved important results in rectification, but some of them have not met expectations

    • Last Update: 2021-06-22
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Global Coatings Network News:

    On the 9th, the Central Fifth Ecological Environmental Protection Inspectorate Group gave feedback to Sichuan Province on the situation of "looking back" and special inspections.






    The Fifth Central Ecological and Environmental Protection Supervision Group inspects the operation of enterprise desulfurization facilities in Mianyang City













    The Provincial Department of Housing and Urban-Rural Development is ineffective in advancing work, and some cities (prefectures) have the idea of ​​"waiting and relying", and even relaxing rectification requirements without authorization.
    The province's 544 urban and rural domestic sewage treatment projects that should be completed in 2018 will "look back" At that time, 190 of them have not yet started; 160 of them have started but could not be completed and put into operation on schedule.
    Of the 88 sewage treatment plants that were operating abnormally as pointed out by the first round of inspectors, 27 were still not rectified.
    The water conservancy department has not done enough to implement the implementation.
    Of the 971 small hydropower stations that have completed ecological flow discharge measures in the province, only 140 have installed online monitoring facilities as required, and most of them are not connected to the management department, which cannot effectively monitor the discharged ecological flow.



    In the 2017 environmental protection target assessment of the party and government, Neijiang City failed to deduct points according to the regulations of Weiyuan County, which was handed over to accountability for the first round of inspectors.
    Dongxing District of the city ranked last in the 2017 environmental protection target assessment.
    One, and was interviewed by the Neijiang Municipal Party Committee, but the top leaders of the "four teams" were all excellent in the annual assessment.



    Third, the problem of perfunctory rectification still exists.
    Some localities and departments didn't grasp the work tightly, the real effort was not enough, and there was even a fluke mentality, which made it difficult to implement relevant rectification measures.
    National or provincial nature reserves such as Baodinggou, Caopo, and Wolong have not been rectified as required.
    The forestry departments of the relevant cities (states) and counties are not working properly and are not rigorously audited, and the provincial forestry departments are weak in supervision and guidance.
    The 17 catering barges in the core area and buffer zone of the Yangtze River Rare and Endemic Fish National Nature Reserve in Yibin City were not in place according to law, and 5 were in operation at the time of the on-site inspection.



    Of the 192 domestic waste treatment projects in the province that should be completed in 2018, as of "Looking Back", there are still 77 projects that have not yet started.
    Of the 18 domestic waste treatment projects that Aba Prefecture should complete in 2018, as of the "look back", there are still 15 that have not yet started; 6 waste landfills including Dongba Town, Nanan County, Nanchong City, Yuanba Town, Nanjiang County, Bazhong City, etc.
    Inadequate treatment of leachate in the site has caused pollution to the surrounding groundwater and farmland.
    In addition, although the informal landfills in Nanmu, Fuhu, Jianxing and other towns in Nanchong City have been closed, the dumped garbage has not yet been cleared and polluted.
    The hidden dangers are obvious.



    Fourth, superficial rectifications and pretending rectifications occur from time to time.
    The Provincial Economic and Information Technology Commission responded in a perfunctory manner in the cleanup and rectification of "scattered and polluted" enterprises.
    It was not strict and untrue.
    It replaced inspections with scheduling.
    It neither strengthened guidance nor carried out assessments.
    The results of the cleanup and rectification of "scattered and polluted" enterprises in the province were not effective.
    .
    At the same time, due to poor rectification work, 14 provincial-level industrial park sewage treatment plants that should be completed and put into operation in 2018, 7 of them are difficult to complete and put into operation on schedule; 25 municipal (county)-level industrial park sewage treatment facilities cannot be completed on schedule.
    Completed and put into operation.



    The Chengdu High-tech Zone did not clarify the requirements for the rectification of Tuojiang pollution until November 2018.
    As of "Looking Back", the Jiangxi River Basin water quality standard plan has not been issued, the dredging of 480,000 cubic meters of Jiangxi River tributaries has not been carried out; 18 sewage treatment facilities in 12 townships (towns) have not been completed as required.
    Sancha Town even adopted the method of installing a steel wire frame in the sewage ditch to fill the gravel to filter the sewage, which is a superficial article, with no practical effect.
    Due to the superficial remediation work, the water quality of Jiangxi River deteriorated from Class III in 2016 to Class IV in 2018, and even worse than Class V in April 2018.



    Luzhou City has not acted or acted slowly in advancing the water environment improvement of the main river basins of the Yangtze River and Tuojiang River.
    The sewage treatment plants in the south and east of the city have insufficient processing capacity, lagging pipeline network construction, and a large amount of sewage directly discharged into the environment in the main urban area.
    Luzhou Laojiao Co.
    , Ltd.
    Luohan Brewing Base's sewage treatment station has insufficient sewage treatment capacity, sewage leakage, and irregular sludge disposal; Luzhou Guocui Winery secretly drains production wastewater into the Yangtze River through the rainwater pipe network.
    Ziyang City's sewage outfall remediation work is in a formal way.
    The 21 sewage outfalls in the Yanjiang section of the Jiuqu River and 84 sewage outfalls in the Ziyang section of the Yanghua River are not connected to the interception pipeline, and the sewage is directly discharged to the Tuojiang River.



    Liangshan Prefecture adjusted the 2.
    35 kilometers of illegally constructed landscape roads in the core area and buffer zone of the Lugu Lake Wetland Nature Reserve for monitoring and popularization of science, but could not prevent tourists from entering, and the rectification was not true; the illegally constructed Wangfei Mansion Site Museum in the core area and 2 The passenger terminal was not included in the scope of rectification and was still operating when inspected.
    The work of the Yanyuan County Government in Liangshan Prefecture was untrue, and the rectification was completed publicly in May 2018.
    The prefectural forestry bureau also submitted the rectification and sales number information to the Provincial Forestry Department in August 2018, making fraud.



    Special inspections found that Sichuan Province has intensified its efforts to rectify the water environment of the Tuojiang River in recent years and achieved initial results.
    However, the structural and distributional pollution problems in the Tuojiang River Basin are still outstanding, and the situation is not optimistic.



    Inadequate management of environmental infrastructure construction.
    The 26 sewage treatment plant projects and 12 sewage pipe network projects in the Ziyang section of the Jiuqu River and the Yanghua River, as well as the 6 sewage treatment plants in Xindu District, Chengdu, could not be completed on schedule.
    Of the 28 municipal and county domestic sewage treatment plants currently in operation in the Tuojiang River Basin, 4 are operating abnormally, and 19 supporting pipe networks have not achieved rain and sewage diversion.
    Due to inadequate pipeline construction, damage and mixed rain and sewage in Deyang Guanghan Sanxingdui Wastewater Treatment Plant, the average influent concentration of chemical oxygen demand was only 46.
    9 mg/L in August 2018; the design scale of Shifang Wastewater Treatment Plant was 30,000 tons /Day, due to incomplete diversion of rain and sewage, a large amount of rainwater and river water are mixed into the pipe network, and the operating load exceeds the design capacity by about 50% for a long time.



    Pollution in agriculture and rural areas remains serious.
    The average fertilizer application rate per mu in the Tuojiang River Basin reached 16.
    5 kg, the average pesticide consumption per mu was 0.
    35 kg, and the utilization rate of pesticide and fertilizer was only about 30%.
    This led to the prominent problem of non-point source pollution in the river basin and the total phosphorus exceeded the standard.
    Eight large-scale livestock and poultry farms (communities), including the Shipan Research Institute of the Provincial Academy of Animal Husbandry Science in the forbidden area of ​​Jianyang City, Chengdu, have not completed the relocation work on schedule, and the breeding wastewater is directly discharged from the Wen'an breeding community in Dongxing District, Neijiang City.



    The rectification of black and smelly water bodies is insufficient.
    There are 24 black and odorous water bodies in built-up areas in cities at the prefecture level and above in the Tuojiang River Basin.
    As of October 2018, 13 of them have just started construction, and the renovation work is obviously lagging behind.
    From January to October 2018, the three assessment sections at the Tuojiang River Mouth, Xingfu Village, and Gongchengpu Ferry did not meet the assessment targets.
    The chemical oxygen demand and the average concentration of ammonia nitrogen at the state-controlled section at Liaojiayan, Weiyuan River did not decrease but increased.



    The inspector requested that the Sichuan Provincial Party Committee and the Provincial Government must resolutely implement the Jinping Ecological Civilization Thought, correctly handle the relationship between economic development and ecological environmental protection, and resolutely shoulder the political responsibility of ecological civilization construction and ecological environmental protection.
    It is necessary to stand firm, consolidate the results, make overall plans to promote water environmental protection, continue to focus on the prevention and control of water pollution in the mainstream of the Yangtze River, Tuojiang, Minjiang and other important tributaries, accelerate the construction of urban and rural domestic sewage treatment facilities, and strive to solve the problem of unmatched pipeline networks and poor operation management.
    problem.
    It is necessary to strictly pursue accountability in accordance with disciplines and laws, and to instruct relevant departments to further investigate the issue of negligence, clarify responsibilities, and strictly, accurately, and effectively hold accountability in accordance with relevant regulations.



    The inspector emphasized that the Sichuan Provincial Party Committee and the Provincial Government should promptly study and formulate a rectification plan based on the feedback from the inspector, and submit it to the State Council within 30 working days.
    The rectification plan and the implementation of rectification shall be disclosed to the public in accordance with relevant regulations.



    The inspection team also sorted out the accountability issues found for ecological damage and has been transferred to the Sichuan Provincial Party Committee and the Provincial Government for handling in accordance with relevant regulations.



    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.