echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Petrochemical News > Appraisal of North China Oil and Gas Development Achievement Reached International Advanced Level

    Appraisal of North China Oil and Gas Development Achievement Reached International Advanced Level

    • Last Update: 2021-06-16
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Sinopec News.
    com recently, at the appraisal meeting of the development professional project of the Ministry of Science and Technology of China Petroleum and Chemical Corporation, the North China Oil and Gas Branch undertakes the "Daniudi Tight Sandstone Gas Reservoir Stable Production Technology" and the "Key Technology for Effective Development of Complicated Water-bearing Tight Gas Reservoir at the Basin "The project passed the appraisal and reached the international advanced level as a whole
    .

    Among them, "quantitative description of remaining gas in tight reservoirs based on water blocking, stress sensitivity, and start-up pressure gradient", "time-varying nonlinear seepage theory system in tight gas reservoirs" and "same well production and injection technology for gas wells" have reached international leading levels
    .

    As of the end of 2016, the Daniudi gas field of North China Oil and Gas Branch had accumulated 352 billion cubic meters of reserves.
    Due to insufficient replacement of new areas, low gas well pressure, rapid decline, and low recovery rate, it is urgent to tackle key adaptive and stable production supporting technologies
    .

    In the past five years, scientific researchers have continued to increase scientific and technological research, continued in-depth research, and formed a number of technological innovations.
    Through the application of the research results of the "Daniudi Tight Sandstone Gas Reservoir Stability Technology" project, a new production capacity of 1.
    05 billion was built in the Daniudi Gas Field.
    Fang, the newly-added economically recoverable reserves of 13 billion cubic meters, an increase of 5.
    5% in oil recovery, the continuous stable production of 3 billion cubic meters of gas fields, and the stable supply of gas from the gas fields to the greater North China region
    .


    Based on the project research results, 12 national invention patents have been declared, 4 of which have been authorized, 4 of utility model patents have been authorized, and 2 of enterprise standards have been issued


    Accelerating the large-scale and profitable development of the Dongsheng Gas Field is the only way to realize the continuous increase in natural gas production in the Ordos Basin of the North China Oil and Gas Branch
    .


    In response to the complex relationship between gas reservoir types and gas-water in the Dongsheng Gas Field, and the difficulty of development, the researchers of the project team of "Key Technologies for Effective Development of Complicated Water-bearing Tight Gas Reservoirs at Basin Edges" carried out accurate identification of complex types of reservoirs with integrated seismic and geology.


    The project results supported the use of 80 billion cubic meters of reserves in the Dongsheng Gas Field, a cumulative new production capacity of 2.
    25 billion cubic meters, an annual gas output of 1.
    57 billion cubic meters, and a billion cubic meters of production investment from 3.
    68 billion yuan to 2.
    6 billion yuan
    .


    From 2018 to 2020, the newly added profit is 442 million yuan, and the profit and tax is 117 million yuan, which has achieved obvious economic and social benefits


    (Ding Jingchen and Xu Dongmei)

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.