echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Coatings News > Paints and Coatings Market > Anti-freezing and anti-condensation work of Qilu Petrochemical Olefins Plant sees practical results

    Anti-freezing and anti-condensation work of Qilu Petrochemical Olefins Plant sees practical results

    • Last Update: 2021-03-29
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
     On November 9th, after a few days of cooling, the temperature began to rise.
    Qilu Petrochemical's Olefin Plant withstood the test of the first cooling down.
    The production facilities were operating stably, providing support for high-load production.

    As the company's chemical industry leader, the olefin plant is very important in winter anti-freezing and anti-condensation work.
    In the early stage, the plant formulated anti-freezing and anti-condensation measures and issued them in advance, requiring all units to actively perform anti-freezing and anti-condensation work to ensure that the winter heavy load production achieves practical results.

    In accordance with the requirements of the "Anti-freezing and Anti-Condensation Plan for Olefins Plants", each workshop implements a leadership contract system.
    Each area is inspected and implemented by the person in charge of each area and the members of the area, and the site is subjected to a carpet inspection and confirmation.
    From the cracking furnace to the oil product, from the steam supply point to the condensation point, from the valve opening to the low point of the heat tracing pipeline, meticulously, without leaving dead ends, confirm item by item, and immediately rectify if the valve opening is small and the condensation effect is poor , To ensure that every pipeline and every storage tank will survive the winter stably.

    Employees strengthen on-site inspections, increase the frequency of inspections, do a good job of purging and replacing idle pipelines, and add blind plates to isolate them in time.
    Strengthen the construction management of deactivated equipment to prevent freezing of construction equipment and ensure the safety of construction equipment.

    All employees of the olefin plant focused on increasing the total volume and doing their best to prevent freezing and anti-coagulation in winter.
    The stable operation of each production device has escorted the olefin plant to sprint the ethylene output of 865,000 tons this year.

    Source: Sinopec News Network
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.